石油化工设备技术 ›› 2022, Vol. 43 ›› Issue (3): 56-62.doi: 10.3969/j.issn.1006-8805.2022.03.011

• 节能环保 • 上一篇    下一篇

连续重整反应加热炉烟气余热回收方案对比分析

王曦宏   

  1. 中国石化工程建设有限公司,北京 100101
  • 收稿日期:2022-02-15 接受日期:2022-04-29 出版日期:2022-06-22 发布日期:2022-06-22
  • 作者简介:王曦宏,男,2011年毕业于北京化工大学化工过程机械专业,工学硕士,主要从事工业炉设计工作,高级工程师,已发表论文3篇。

Comparative Analysis of Waste Heat Recovery Schemes for Continuous Catalytic Reforming Unit Furnace

Wang Xihong   

  1. SINOPEC Engineering Incorporation, Beijing, 100101
  • Received:2022-02-15 Accepted:2022-04-29 Online:2022-06-22 Published:2022-06-22

摘要: 为满足低压降的工艺要求,连续重整反应加热炉辐射段炉管采用有别于一般炼油装置加热炉的多流路正“U”形或倒“U”形的炉管构型。基于其特殊的炉管构型,连续重整反应加热炉对流段无法采用预热辐射介质的方式回收辐射段的高温烟气余热。文章对目前石化行业已应用的连续重整装置反应加热炉烟气余热回收方案进行讨论和分析,通过对比不同的烟气中段温度工况下余热回收的经济性和社会效应的影响,提出“经济烟气中段温度”的概念,并总结得到选取“经济烟气中段温度”的方法。结论对后续连续重整装置反应加热炉优化回收辐射段高温烟气余热方案,进一步提高连续重整反应加热炉整体经济性提供了必要的理论依据。

关键词: 连续重整反应加热炉, 烟气余热回收, 经济烟气中段温度

Abstract: In order to meet the process requirements of low pressure drop, furnace tube in the radiation section of Continuous Catalytic Reforming (CCR) furnace adopts the "U" type or inverted "U" type furnace tube configuration which is different from the heating furnace of general oil refining units. Based on its special furnace tube configuration, the convection section of CCR furnace cannot recover the waste heat of high-temperature flue gas in the radiation section by means of flue gas heat extraction of preheating process. This paper discusses and analyzes the waste heat recovery schemes for flue gas from CCR furnace, which has been applied in petrochemical industry. By comparing the influence of economic and social effects under different flue gas middle temperature conditions, the concept of "mid-section temperature of economical flue gas" is proposed, and the method of selecting "economic flue gas middle temperature" is obtained through summary. The conclusion of this paper provides a necessary theoretical basis for optimizing the scheme of recovering high-temperature flue gas waste heat in the radiation section of the CCR furnace of the CCR unit and further improving the overall economy of CCR furnace.

Key words: continuous reforming reaction heating furnace, flue gas waste heat recovery, mid-section temperature of economical flue gas