Petro-chemical Equipment Technology ›› 2022, Vol. 43 ›› Issue (4): 36-41.doi: 10.3969/j.issn.1006-8805.2022.04.008
• CODES AND STANDARDS • Previous Articles
Wang Ling, Guan Jian
Received:
Accepted:
Online:
Published:
Contact:
Abstract: The unsound standard system exists in the design and manufacture of equipment for LNG receiving stations in China, which affects the efficient implementation of project construction and becomes the hidden trouble for stable and excellent operation of the equipment. Aiming at these problems, this paper analyzes the standardization development strategy, LNG receiving station planning, concentration of construction units, self-owned technology and equipment development. And it is concluded that the equipment standardization conditions are ripe. From the aspects of processing capacity, technical standard, material selection, performance index and inspection and acceptance, the paper puts forward the standardization scheme for cryogenic tank plate, compressor, unloading arm, in-tank pump and gasifier.
Key words: standard, receiving station, liquefied natural gas/LNG, BOG, design finalization, unloading arm, in-tank pump, gasifier
Wang Ling, Guan Jian. Research on Standardization Construction of Equipment of LNG Receiving Station Based on Chinese Technology[J].Petro-chemical Equipment Technology, 2022, 43(4): 36-41.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://syhgsbjs.sei.com.cn/EN/10.3969/j.issn.1006-8805.2022.04.008
http://syhgsbjs.sei.com.cn/EN/Y2022/V43/I4/36
Cited